New roof in August 2017, as well as new windows and siding in October of 2017. New 1.25 inch poly line from well through footer and reconnect with ball valve, July 2021. New 1.25" PVC dropped into well June of 2024, new 1 HP submersible pump ( 3 Wire) July 2013, septic pumped March 2024 by Sweets Septic.